Solar insightsWhat to expect from a solar installation
From assessment to handover, understand the stages of your installation.
Start with your site and goals
The initial discussion reviews your location, electricity use and priorities. A site visit helps assess the roof, shading, safe access and electrical connections.
Review a tailored proposal
Equipment selection, capacity and installation scope follow the assessment. Discuss the work, exclusions, expected operating behavior and maintenance arrangements before agreeing.
Coordinate the installation
Confirm access, the work schedule and any operational considerations. Mounting, electrical connections and protection are carried out according to the agreed project scope.
Understand the handover
Testing and operating guidance help you understand the completed system. Ask about normal inverter operation, relevant documents and how to arrange support.
Discuss your solar requirements ↗
Illustrative service imageryTAKE THE NEXT STEPBring the guide
back to your own site.
A general guide can help you prepare questions, but the actual system and work requirements depend on your property and equipment. Your site conditions, operating priorities and available records shape a useful assessment.
Tell us what you want to achieve, or describe the issue you are seeing. We can then discuss the information needed and the next practical step.
Discuss your requirements ↗ UNDERSTAND YOUR OPTIONSDifferent systems.
Different priorities.
The right configuration starts with understanding what you need from your energy system.

For daytime energy useOn-grid solar
A grid-connected system is assessed around your electricity use and site conditions. Standard on-grid equipment normally stops during a grid outage.
Explore this system ↗ 
When backup is a priorityHybrid & batteries
Solar, inverter capability and compatible storage are planned together. Backup performance depends on the loads you run and the proposed system.
Explore this system ↗ 
For on-site consumptionZero-export solar
Compatible inverter controls and metering can be configured to limit export. The connection and current utility requirements still need assessment.
Explore this system ↗ Equipment, capacity and utility arrangements are confirmed for the actual site. No generic package can replace that assessment.