Solar insightsA practical solar maintenance checklist
Know what to watch and when to ask for help.
Keep an eye on performance
Review your inverter’s normal operation and note significant changes in output. Weather and seasonal conditions affect production, but persistent changes deserve attention.
Notice visible changes safely
From a safe, accessible location, look for obvious damage, shading or debris. Avoid climbing onto a roof or opening electrical equipment yourself.
Arrange a professional inspection
Connection checks, protection equipment, inverter faults and battery assessment should be handled by a qualified technician with appropriate isolation and access arrangements.
Keep useful records
Save installation documents, equipment details and previous maintenance notes. These help the service team understand your system and investigate problems.
Discuss your solar requirements ↗
Illustrative service imageryTAKE THE NEXT STEPBring the guide
back to your own site.
A general guide can help you prepare questions, but the actual system and work requirements depend on your property and equipment. Your site conditions, operating priorities and available records shape a useful assessment.
Tell us what you want to achieve, or describe the issue you are seeing. We can then discuss the information needed and the next practical step.
Discuss your requirements ↗ UNDERSTAND YOUR OPTIONSDifferent systems.
Different priorities.
The right configuration starts with understanding what you need from your energy system.

For daytime energy useOn-grid solar
A grid-connected system is assessed around your electricity use and site conditions. Standard on-grid equipment normally stops during a grid outage.
Explore this system ↗ 
When backup is a priorityHybrid & batteries
Solar, inverter capability and compatible storage are planned together. Backup performance depends on the loads you run and the proposed system.
Explore this system ↗ 
For on-site consumptionZero-export solar
Compatible inverter controls and metering can be configured to limit export. The connection and current utility requirements still need assessment.
Explore this system ↗ Equipment, capacity and utility arrangements are confirmed for the actual site. No generic package can replace that assessment.